E17
Enel X
Dynamic Load Management (DLM) Communication Failure
Charger shows E17 and stops charging; app may indicate ‘load management error’ or ‘DLM communication fault’ for dynamic load management setups.
Advertisements
Safety Warning
This repair may involve working with high voltage components or water connections. Always unplug the appliance before removing any panels.
If you are not confident in your ability to perform this repair safely, we strongly recommend contacting a professional technician.
Advertisements
Possible Causes
Lost communication with external load controller, Faulty CT clamps on main supply, Misconfigured DLM settings, Damaged DLM communication cable
How to Fix / Troubleshooting
Safety: DLM involves monitoring mains; only qualified persons should work inside the main panel.
- Step 1 – Check network: Ensure the Enel X charger and any external DLM controller are online and connected to the same network as required.
- Step 2 – App settings: In the Enel X app, verify that DLM is configured correctly (correct CT ratings, phase configuration, and controller address).
- Step 3 – Inspect CT clamps: With power ON but panel closed, visually confirm that CT clamps on the main supply are properly closed around the conductors and not loose.
- Step 4 – Communication wiring: With power OFF, check any hardwired communication cables between the charger and DLM controller for loose terminals or damage.
- Resolution: If communication cannot be restored, temporarily disable DLM in the app (if allowed) to restore basic charging, or replace the DLM controller or CT clamp set as needed.
Advertisements
Repair Difficulty
Hard
4/5
Required Part
Dynamic Load Management Controller / CT Clamp Set