All Power America Exercise Timer / Scheduler Malfunction

Generator fails to perform its scheduled weekly exercise run; no codes are displayed.

Advertisements

Possible Causes

Incorrect controller time/date settings, Disabled exercise mode, Controller firmware glitch, Internal clock failure

How to Fix / Troubleshooting

Safety first: Ensure the generator is in AUTO mode and that utility power is present before programming.

  • Check controller settings: Access the All Power America controller menu and verify the current time, date, and exercise schedule. Correct any errors.
  • Enable exercise: Confirm that the exercise function is turned ON and set to the desired day and time.
  • Manual test: Start the generator manually to confirm it can run. If manual start works but exercise does not, the controller's scheduler may be faulty.
  • Controller replacement: Replace the control board if the internal clock or scheduler cannot be corrected.
Advertisements

Repair Difficulty

Easy 2/5

Required Part

Generator Control Board
Check Price on Amazon

We may earn a commission from links on this page.

Advertisements